Chapter 4: Installing the Switch on a Table or in an Equipment Rack
Installing the AT-x550-18XTQ or AT-x550-18XSQ Switch in an
Equipment Rack with the AT-RKMT-J15 Bracket

Required Items

Installing the
Switch
100
This section contains the procedure for installing the AT-x550-18XTQ or
AT-x550-18XSQ Switch in a standard 19-inch equipment rack, with the
optional AT-RKMT-J15 Bracket.
The following items are required to install the switch in an equipment rack
with the AT-RKMT-J15 Bracket:
One AT-RKMT-J15 equipment rack bracket (sold separately)
Four M4x6mm bracket screws (included with the switch)
Cross-head screwdriver (not provided)
Flat-head screwdriver (not provided)
Four standard equipment rack screws (not provided)
To install the switch in a 19-inch equipment rack with the AT-RKMT-J15
Bracket, perform the following procedure:
1. Have another person hold the AT-RKMT-J15 Bracket at the desired
location in the equipment rack while you secure it using four standard
equipment rack screws (not provided). Refer to Figure 43.
Figure 43. Installing the AT-RKMT-J15 Bracket in the Equipment Rack

Advertisement