Figure 80: Removing The Dust Cover From An Sfp Or Sfp+ Transceiver; Figure 81: Positioning The Sfp Or Sfp+ Handle In The Upright Position - Allied Telesis AT-x550-18XTQ Installation Manual

Stackable 10gigabit intelligent access ethernet switches, alliedware plus v5.4.8-0.2
Hide thumbs Also See for AT-x550-18XTQ:
Table of Contents

Advertisement

Chapter 8: Cabling the Networking Ports
172
Figure 80. Removing the Dust Cover from an SFP or SFP+ Transceiver
7. Verify the position of the handle on the transceiver. If the transceiver is
in a top slot, the handle should be in the upright position, as shown in
Figure 81. If the transceiver is in a bottom slot, the handle should be in
the down position.
SFP Handle
Figure 81. Positioning the SFP or SFP+ Handle in the Upright Position
8. Connect the fiber optic cable to the transceiver, as shown in Figure 82
on page 173. The connector on the cable should fit snugly into the
port, and the tab should lock the connector into place.

Advertisement

Table of Contents
loading

This manual is also suitable for:

X550 seriesAt-x550-18xsqAt-x550-18xspqm

Table of Contents