Installing At-Qsfpsr4 Or At-Qsfplr4 Transceivers - Allied Telesis AT-x550-18XTQ Installation Manual

Stackable 10gigabit intelligent access ethernet switches, alliedware plus v5.4.8-0.2
Hide thumbs Also See for AT-x550-18XTQ:
Table of Contents

Advertisement

Chapter 8: Cabling the Networking Ports

Installing AT-QSFPSR4 or AT-QSFPLR4 Transceivers

176
This section contains the procedure for installing AT-QSFPSR4 or AT-
QSFPLR4 transceivers in the QSFP+ ports 17 and 21.
Please review "Guidelines to Handling SFP, SFP+, and QSFP+
Transceivers" on page 169 before performing this procedure.
To install AT-QSFPSR4 or AT-QSFPLR4 transceivers, perform the
following procedure:
1. Remove the dust cover from QSFP+ slot 17 or 21. Refer to Figure 84
on page 177.
2. Slide a QSFP+ transceiver into the slot until it clicks into place.
3. Attach fiber optic cable to the transceiver.
4. Connect the other end of the cable to a compatible QSFP+ port in
another network device.
5. Repeat this procedure to install a second QSFP+ transceiver.
Note
To remove the connector and cable from the slot, gently push on the
connector, pull on the release tab, and slide the connector from the
slot.

Advertisement

Table of Contents
loading

This manual is also suitable for:

X550 seriesAt-x550-18xsqAt-x550-18xspqm

Table of Contents