Figure 42: Installing The Switch In An Equipment Rack - Allied Telesis AT-x550-18XTQ Installation Manual

Stackable 10gigabit intelligent access ethernet switches, alliedware plus v5.4.8-0.2
Hide thumbs Also See for AT-x550-18XTQ:
Table of Contents

Advertisement

4. Have another person hold the switch at the desired location in the
equipment rack while you secure it using four standard equipment rack
screws (not provided). Refer to Figure 42.
Figure 42. Installing the Switch in an Equipment Rack
5. Install the other switches of the stack with the appropriate instructions
in this chapter and Chapter 5, "Installing the Switch on a Wall" on page
111.
6. After installing the switches, go to Chapter 6, "Building the Trunk with
Default Stacking Ports 17 and 21" on page 125 or Chapter 7, "Building
the Trunk with Optional Stacking Ports" on page 143.
x550 Series Installation Guide for Virtual Chassis Stacking
99

Advertisement

Table of Contents
loading

This manual is also suitable for:

X550 seriesAt-x550-18xsqAt-x550-18xspqm

Table of Contents