Chapter 4: Installing the Switch on a Table or in an Equipment Rack
9. To install a second switch in the bracket, repeat steps 4 to 8.
10. Slide in the bracket tray. Refer to Figure 49.
Figure 49. Sliding in the Bracket Tray
11. Tighten the two thumbscrews to secure the tray to the bracket. Refer
to Figure 50 on page 105.