Figure 37: At-Rkmt-J14 Bracket Holes; Figure 38: Switch Orientations With The Front Panel Facing The Front Of The Equipment Rack - Allied Telesis AT-x550-18XTQ Installation Manual

Stackable 10gigabit intelligent access ethernet switches, alliedware plus v5.4.8-0.2
Hide thumbs Also See for AT-x550-18XTQ:
Table of Contents

Advertisement

Chapter 4: Installing the Switch on a Table or in an Equipment Rack
Set 1
Set 2
Figure 37. AT-RKMT-J14 Bracket Holes
You can use the different sets of holes on the switch and brackets to install
the switch in the equipment rack in a variety of orientations. You can install
it with the front panel flush with, extending in front of, or recessed behind
the front of the equipment rack. The illustrations in Figure 38 show the
switch orientations with the front panel facing the front of the equipment
rack.
Figure 38. Switch Orientations with the Front Panel Facing the Front of the
Equipment Rack
96

Advertisement

Table of Contents
loading

This manual is also suitable for:

X550 seriesAt-x550-18xsqAt-x550-18xspqm

Table of Contents