Installing The Switch; Figure 52: At-X550-18Xspqm Switch Orientations In An Equipment Rack - Allied Telesis AT-x550-18XTQ Installation Manual

Stackable 10gigabit intelligent access ethernet switches, alliedware plus v5.4.8-0.2
Hide thumbs Also See for AT-x550-18XTQ:
Table of Contents

Advertisement

Figure 52. AT-x550-18XSPQm Switch Orientations in an Equipment Rack
Installing the
If you have not chosen an orientation for the switch in the equipment rack,
review "Switch Orientations in the Equipment Rack" on page 106.
Switch
Please review the installation guidelines in "Choosing a Site for the Switch"
on page 84 before installing the switch in an equipment rack.
To install the switch in a 19-inch equipment rack, perform the following
procedure:
1. Place the switch on a level, secure surface.
2. Attach the two brackets to the sides of the switch in the selected
Caution
The chassis may be heavy and awkward to lift. Allied Telesis
recommends that you get assistance when mounting the chassis in
an equipment rack.  E28
position, using the eight M4x6mm screws included with the unit. The
illustration in Figure 53 on page 108 shows the installation of the
brackets such that the front panel of the switch is even with the front of
the equipment rack.
x550 Series Installation Guide for Virtual Chassis Stacking
107

Advertisement

Table of Contents
loading

This manual is also suitable for:

X550 seriesAt-x550-18xsqAt-x550-18xspqm

Table of Contents