Chapter 5: Installing the Switch on a Wall

Installing the Switch on a Plywood Base

118
This procedure assumes that the plywood base for the switch is already
installed on the wall. Please review "Reviewing Safety Precautions" on
page 80 and "Choosing a Site for the Switch" on page 84 before
performing this procedure. Allied Telesis recommends a minimum of two
people for this procedure.
Warning
The device is heavy. Always ask for assistance before moving or
lifting it to avoid injuring yourself or damaging the equipment.
Warning
The device should be installed on the wall by a qualified building
contractor. Serious injury to yourself or others or damage to the
equipment may result if it is not properly fastened to the wall. 
E105
To install the switch on the plywood base, perform the following
procedure:
1. Place the switch on a table.
2. For the AT-x550-18XTQ or AT-x550-18XSQ Switch, install the four
AT-BRKT-J24 wall brackets to the sides of the unit, with the sixteen
M4x6mm screws included with the switch. Refer to Figure 58.
Figure 58. Installing the Wall Brackets