Figure 79: Installing An Sfp Transceiver - Allied Telesis AT-x550-18XTQ Installation Manual

Stackable 10gigabit intelligent access ethernet switches, alliedware plus v5.4.8-0.2
Hide thumbs Also See for AT-x550-18XTQ:
Table of Contents

Advertisement

Figure 79. Installing an SFP Transceiver
5. Slide the transceiver into the slot until it clicks into place.
Note
If you are ready to attach the fiber optic cable to the transceiver,
continue with the next step. Otherwise, repeat steps 1 to 4 to install
the remaining transceivers in the switch.
6. Remove the dust cover from the transceiver, as shown in Figure 80 on
page 172.
x550 Series Installation Guide for Virtual Chassis Stacking
171

Advertisement

Table of Contents
loading

This manual is also suitable for:

X550 seriesAt-x550-18xsqAt-x550-18xspqm

Table of Contents