1.3 Installation

Installation requirements are described in Table 1-2.
Item
Leak Detector Location
Power
Mains Supply Voltage Fluctuations Must not exceed ±10% of the nominal voltage.
Pollution
Fixed Mains Socket Outlet
34
Agilent Technologies Helium Leak Detector
Table 1-2 Installation Requirements
Close to its power source.
Two to three feet clearance for proper ventilation.
Sufficient room for the operator to safely maneuver to
perform testing.
See Table 1-1 on page 26.
Pollution Degree 2 per EN61010-1 Standard.
Connect to a building protective earthing system.
Requirement
Additional ventilation requirements for
your specific application are discussed in
Section 1.3.2 "Recommended Additional
Services" on page 36.
When installing a bench system with a
mechanical pump, the power cord for that
pump, if connected to the back of the leak
detector, cannot exceed three meters.
Additionally, connect the mechanical pump
to the leak detector using the shortest
possible vacuum connection to maximize
vacuum performance.