Mobile Unit Oil Fill - Agilent Technologies G8610A Operation Manual

Helium leak detector
Table of Contents

Advertisement

Agilent Technologies Helium Leak Detector
Powering Up
1. Ensure that the roughing pump is switched on and if applicable (IDP-15), set to the
correct voltage setting.
2. Switch the leak detector on, cover the leak detector inlet with a blank-off cap (provided
and already in place), and wait for the screen to read System Ready before operating.
Figure 1-12 Mobile Unit Oil Fill
33

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

G8610bG8611aG8611cG8612aG8611bG8612b ... Show all

Table of Contents