Connecting To The Interrogator - HBM FS22 SI User Manual

Industrial braggmeter si
Table of Contents

Advertisement

BraggMONITOR SI User Interface
86
To adjust the Local Time, chose the "Change date and
time..." button (Fig. 7.5).
Fig. 7.7
7.1.2

Connecting to the Interrogator

The first action to perform before starting an acquisition
is to establish a connection between the interrogator and
BraggMONITOR. For that, press the "Connect" button
(number
1
in Fig. 7.8).
A4249-8.0 HBM: public
FS22 SI

Advertisement

Table of Contents
loading

Table of Contents