To run the Pressure and Alarms tests:
1) From any
screen, touch
Test & Options
2) From the
"Test & Options"
screen, touch
Both Tests
Figure 23 – Starting Automatic Tests
Test Sequence
The automated test sequence consists of two distinct parts—Alarm tests and Pressure Holding
tests. The Pressure Holding Test, the Alarm test, or both tests can be started by touching the
2008K Hemodialysis Machine Operator's Manual Rev P
3) Press
CONFIRM
Chapter 2—Daily Preparation for Treatment
53