Installation Checklist; Contents Of This Chapter; Checklist - ABB ACS580-07 Hardware Manual

General purpose drives
Hide thumbs Also See for ACS580-07:
Table of Contents

Advertisement

Installation checklist

Contents of this chapter

This chapter contains a list for checking the mechanical and electrical installation of the
drive.

Checklist

Check the mechanical and electrical installation of the drive before start-up. Go through the
checklist together with another person.
WARNING!
Obey the safety instructions. If you ignore them, injury or death, or damage to the
equipment can occur. Do the steps in section
before you start the work. Go through the checklist together with another person.
Check that ...
The ambient operating conditions meet the specifications. See the technical data.
The drive cabinet has been fixed to floor, and if necessary due to vibration etc, also by its top to the
wall or roof.
The cooling air will flow freely in and out of the drive.
If the drive will be connected to an IT (ungrounded) or a corner grounded TN network: The EMC filter
of the drive has been disconnected. Contact your local ABB representative for instructions.
There is an adequately sized protective earth (ground) conductor between the drive and the switchboard,
and the conductor has been connected to appropriate terminal, and the terminal have been tightened.
(Pull the conductor to check.) Proper grounding has also been measured according to the regulations.
The input power cable has been connected to the appropriate terminals, the phase order is right, and
the terminals have been tightened. (Pull on the conductors to check.)
Installation checklist 107
8
Electrical safety precautions (page 16)

Advertisement

Table of Contents
loading

Table of Contents