Connection procedure (IEC, frames R6 to R9)

1. Do the steps in section
2. Open the cabinet door.
3. For drives without option +E205: To remove the mounting plate, undo the mounting
screws and unplug the connectors on top of it:
auxiliary voltage supply connectors X23, X22 and X21
Contactor control connectors: X3, X6
contactor feedback connector X250 with option +F250
cabinet door fan supply connector X8 and control X505
cabinet heater connector X300 with option +G300.
4. For drives without option +E205: Remove the shrouds (4a, 4b, 4c and 4d). To remove
the shroud on the power cable terminals, release the clips with a screwdriver and pull
the shroud out (4d). For drives with option +E205: Remove the shrouds 4a, 4b.
3
4b
5. For drives without option +E205: Knock out holes in the shroud for the motor cable
conductors.
6. Peel off 3 to 5 cm of the outer insulation of the cables above the cable entries with the
conductive sleeves for the 360° high-frequency grounding.
Electrical safety precautions (page 16)
4a
Electrical installation 77
before you start the work.
4c
4d