Final Placement; Attaching The Cabinet To The Floor And Wall Or Roof; General Rules - ABB ACS580-07 Hardware Manual

General purpose drives
Hide thumbs Also See for ACS580-07:
Table of Contents

Advertisement

Final placement

Attaching the cabinet to the floor and wall or roof

General rules

Install the drive cabinet in an upright vertical position with its back against a wall (a), or
back-to-back with another cabinet (b).
Leave 400 mm (15.75 in) free space above the basic roof level of the cabinet for cooling.
IP54 (UL Type 12) fan replacement requires 320 mm (12.6 in) free space above.
Leave some space at the side where the cabinet outmost hinges are to allow the doors
to open sufficiently (w). The doors must open 120° to allow the drive module replacement.
b
Move the cabinet into its final position with an iron bar.
Place a wooden piece at the bottom edge of the cabinet
in order not to damage the cabinet frame with the iron
bar.
> 400 mm (15.75")
a
Mechanical installation 51
w
120°

Advertisement

Table of Contents
loading

Table of Contents