Novajet PROe Series Service Manual
Install the Trailing Cable Assembly
1. Apply two new pieces of double sided tape to the Stabilizer
Bracket. Ensure that the tape is in the same location as the
original tape was.
2. Slip the ferrite around the Trailing Cable and insert the right
side of the Trailing Cable Assembly through the access hole
provided in the Right Side plate.
3. Slide the Carrier Assembly (if installed) to the far left side of
the Slide Shaft. While ensuring a 5" (125mm) overhang on the
right side, position the Trailing Cable over the Stabilizer
Bracket and slowly lower it onto the bracket. Ensure that the
Trailing Cable goes on straight and that there are no buckles in
the cable. Firmly press the Trailing Cable Assembly onto the
tape to secure it into position.
4. Connect the right end to the MPCB at the J6 location.
5. Tape the ferrite to the Trailing Cable approximately 1/4" (6mm)
from the left side of the side plate.
6. If the Carrier Assembly is not installed, perform steps 5
through 18 of the Install the Carrier Assembly, Carrier Belt,
and the Frame Tensioner procedures.
132
Assembly\Disassembly
The right side of the Trailing Cable (the side connected
to the MPCB) must extend beyond the Stabilizer
Bracket by 5" (4 7/8" - 5 1/8") or 128mm (125mm -
131mm.)