Carrier Bushing Removal - ENCAD 60e Service Manual

Novajet proe series color inkjet printer
Table of Contents

Advertisement

Novajet PROe Series Service Manual
2. Use a flat tip screwdriver to push up on the latch which holds
the Carrier Bushing in place. See Figure 5-18.
3. Pull the Carrier Bushing out of the Carrier Assembly.
4. Repeat Steps 2 and 3 for the other Carrier Bushing.
5. Orient the new Bushing as shown in Figure 5-19 so that the
metal tab on top of the Bushing goes into the Carrier Assembly
first.
6. Push the Bushings in until they snap into place.
7. Perform the Reinstall the Carrier Assembly, Carrier Belt, and
the Frame Tensioner procedures to reinstall the Carrier
Assembly if Carrier was removed.
128
Assembly\Disassembly
Figure 5-18. Carrier Bushing Removal.
Figure 5-19. Carrier Bushing Installation.

Advertisement

Table of Contents
loading

This manual is also suitable for:

42eNovajet proe

Table of Contents