Adjusted Heights
LS10/LS15, Programs
Displays the number of points that were adjusted.
Point:
PtID
Displays the current point ID. Use the navigation keys to scroll
through the point IDs.
Displays the adjusted height of the selected point.
H(new)
Displays the originally measured height of the selected point.
H(old)
Displays the height difference (residual) between the original and
Residue
the adjusted height of the selected point.
To exit the screen and end the program, press OK.
The original measurements are kept in the job and are stored as measured
triplets. For each adjusted point, an adjusted triplet is created additionally and
stored to the current job.
64