Programs; General; Common Fields - Leica LS10 User Manual

Digital level
Hide thumbs Also See for LS10:
Table of Contents

Advertisement

7
7.1
7.1.1
Description of
Fields
LS10/LS15, Programs

Programs

General

Common Fields

The following table describes common fields that are found within the programs.
Field
PtID
Backsight Pt / PtBS
Foresight Pt
Start height / Start H
Height BS
Height FS
Total dH
Instr.Horizon
Staff
Distance
Total Dist
Dist.Balance
Stat.ID
Rem. / Remark / Code
East
North
Height
Description
Point ID of the point.
Point ID of backsight point.
Point ID of foresight point.
Height of starting point.
Height of backsight point.
Height of foresight point.
Sum of the height differences determined between the
first backsight and the current foresight/backsight obser-
vation of this line.
Instrument horizon: Height of line of sight.
Height reading on staff.
Distance between instrument and staff
Sum of the distances measured between the first back-
sight and the current foresight/backsight observation of
this line.
Difference between the sum of all foresight distances and
the sum of all backsight distances. For high precision line
levelling, the distance balance at the end of the line should
be close to zero.
ID of current instrument station.
Remark (Rem.) or Code name depending on the selected
method.
• Remark: This text is an additional information stored to
the corresponding measurement.
• Code: Within the Code tab, highlight a code from the
code list. The highlighted code is added to the meas-
urement that is stored next. For details on adding or
editing a code refer to "9 Coding".
Easting coordinate of the point.
Northing coordinate of the point.
Height coordinate of the point.
43

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ls15

Table of Contents