Case WX145 Operator's Manual page 321

Hide thumbs Also See for WX145:
Table of Contents

Advertisement

SECTION 7
CLAMSHELL BUCKET OPERATION
Set to vertical position the marker grooves on the
valves' squares (1).
SWITCHING OVER OF VOLUME FLOW FROM
STANDARD BUCKET TO CLAMSHELL
By means of switch (2) the machine can be
switched over from backhoe operation with unlim-
ited volume flow in the working pumps, to grab oper-
ation with presettable independent volume flow
rates for opening and closing of the clamshell.
Standard bucket
Depress the blank face of the
switch (2).
Clamshell bucket
Depress the symbol face of
the switch (2).
The display shows the clam-
shell symbol (3).
The volume flow rates/speeds for opening and clos-
ing of the clamshell can be set via the display inde-
pendently of one another.
7-24
Copyright ©
43
44
45

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wx165Wx185Wx 145

Table of Contents