18. Verify that the level gauge head is
properly aligned. The cover on the
terminal compartment shall be parallel
with the Verification Pin.
Still-pipe
The notch on the still-pipe flange
indicates the direction of the
Verification Pin.
19. Connect the electrical cabling and
configure the gauge by using the
TankMaster WinSetup software, see
the Raptor System Configuration
Manual (Document no. 300510EN).
20. Configure the level gauge for LPG
measurements (see "LPG
Configuration" on page 4-20).
Reference Manual
00809-0100-5900, Rev CA
June 2014
Section 3. Installation