Reference Manual
00809-0100-5900, Rev CA
June 2014
2.6 INSTALLATION
PROCEDURE
Section 2. Overview
Follow these steps for proper installation:
Review Installation Considerations.
See "Installation Considerations"
on page 3-3.
Mount the gauge.
See "Mechanical Installation" on
page 3-19.
Wire the gauge.
See "Electrical Installation" on
page 3-41.
Make sure covers and
cable/conduit connections are tight
Power Up the gauge
Configure the gauge.
See Section 4: Configuration.
Verify measurements
Enable the Write
Protection switch
Rosemount 5900S Series
SIL configuration
2-13