Ny-Series Instructions Reference Manual (W560 - Omron NY532-5400 Reference Manual

Ny-series
Hide thumbs Also See for NY532-5400:
Table of Contents

Advertisement

An example of the start at PV operation is provided below. The following table gives the contents of Pro-
gramPattern[].
Step number
Value of ReachSP
Value of TimeWidth
In this example, the value of PresentSP increases from the value for step 0. Therefore, a search is
made only for 40 minutes after the start of processing, i.e., the point where the value of PresentSP
starts to decrease.
Assume that the value of PV at the start of instruction execution is 110. In this case, processing starts
as shown in the following figure where PresentSP equals 110.
Processing is started from this point.
Set point
200
120
110
100
80
30
0
10 m
 Timing for Start at PV Operation
The operations of the time-related variables for the start at PV operation are described in the follow-
ing table.
Name
ElapseTime
ProgressTime
LeftTime
StepProgressTime
StepLeftTime
 Changing the Value of StartAtPV during Instruction Execution
Any changes to the value of StartAtPV during execution of the instruction are ignored.

NY-series Instructions Reference Manual (W560)

0
1
0
1
30
100
T#0s
T#10m
A search is made only to this point,
i.e., to where the value of PresentSP starts to decrease.
15 m
15 m
4 m 5 m
Search range
Contains 0.
Gives the time from step 0 to the point that was found in the search.
Gives the time from the present to the end of EndStepNo.
Gives the time from the beginning of the current step to the point that was found in
the search.
Gives the time from the present until all processing is completed for the current step.
ProgramPattern[] element number
2
3
4
2
3
4
120
200
200
T#15m
T#0s
T#15m
Time [min]
Operation
2 Instruction Descriptions
5
6
7
5
6
7
80
80
0
T#4m
T#5m
T#0s
2
2-781

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents