Operation; Getting Started - AEMC 8335 Power Pad User Manual

3-phase power quality analyzer
Table of Contents

Advertisement

4.1 Getting Started

NOTE: Make sure the PowerPad
Connecting:
Start the instrument by pressing the
Configure the unit to obtain the required results and type of network (see § 4.3).
Connect the current leads and sensors to the PowerPad
Connect the ground and/or neutral lead to the network ground and/or neutral
(when distributed), as well as the corresponding current sensor.
Connect the L1 phase lead to the network L1 phase, as well as the
corresponding current sensor
Repeat the procedure for phases L2, L3 and N
Note: Complying with this procedure limits connection errors to a minimum and
conserves time.
Disconnecting:
Proceed in the reverse order to connecting, always finishing by disconnecting
the ground and/or neutral (when distributed)
Disconnect the unit leads and power it down.
Recharge the battery and recover the data registered where necessary.
USB sockets can be used to connect the unit to any type of network.
The following precautions for use must be complied with:
Do not connect any voltages exceeding 1000Vrms in relation to the
ground/earth.
When connecting and disconnecting the batteries, check that measuring
leads are disconnected.
Shop for AEMC products online at:
Power Quality Analyzer Model 8335
CHAPTER 4

OPERATION

PowerMeterStore
www.
is fully charged before use.
®
button.
.
®
1.877.766.5412
.ca
35

Advertisement

Table of Contents
loading

This manual is also suitable for:

8335Powerpad

Table of Contents