What Is The Optional Suretrac Process Verification - Pitney Bowes FastPac DI900 Manuallines

Scan code guidelines
Hide thumbs Also See for FastPac DI900:
Table of Contents

Advertisement

2 • DI900/DI950 Scan Code Concepts
Scan Codes
and Integrity
Theory
Connection be-
tween PC with PB
FIRST™ PD and PC
Communicating to
the DI900/DI950
Scan Definition
for PB FIRST™ PD
DI900/DI950 Job
Tracking of Mail
Pieces by the Sure-
Trac™ Software
NOTES for PB
FIRST™ PD
2-14
What is the Optional SureTrac™ Process Verification?
SureTrac™ Process Verification is an optional PC-based product that is used
in conjunction with PB FIRST™ PD and the DI900/DI950 inserter that allows
you to track all mailpieces in a job when run through the inserter. This verifica-
tion process requires barcode 39 for the scan code in the job; hence, the high-
est integrity level must be installed on the inserter.
Once you have installed the SureTrac™ software on both the "client" PC (the
one creating the job in PB FIRST PD) and the "server" PC (the one connected
to the DI900/DI950 inserter), you can create an online closed-loop job. An
online closed-loop job is one which the scan definition is first created on the
DI900/DI950, then sent to the client PC. Using PB FIRST PD, a job is created
from this scan definition and then printed, with the job data being sent back
to the server PC. The job is monitored by the Process Verification software
on the server PC as it is physically run through the DI900/950 inserter. In this
mode, the verification software will identify problem mailpieces and allow you
to reprint/fix them as needed. (You can also create online open loop jobs,
where no job reconciliation takes place.)
See the table below for an overview of SureTrac™ Process Verification. For
additional information, refer to SureTrac™ documentation and Help.
Overview of SureTrac™ Process Verification
Offline Job
None
Manually set up
on PC running PB
FIRST PD
None
This is the "normal"
PB FIRST PD job for
all inserters (i.e., you
are not using the
SureTrac™ software
or you disabled its
functionality)
Online Job
Closed-Loop Job
(Process Verification)
Required
Set up on DI900/950 and
downloaded to "client" PB
FIRST PC via SureTrac
"server" PC
Software tracks pieces
and determines how each
should be processed.
Checks/validates the in-
serter run for errors.
Certain tabs in the Mail
Creation Print Manager
become active under this
setting (that are grayed
out when you are offline).
Closed loop jobs can only
be done using 3 of 9 bar-
code (not OMR).
Open-Loop Job
Required
Set up on DI900/950 and
downloaded to "client" PB
FIRST PC via SureTrac
"server" PC
None
Certain tabs in the Mail
Creation Print Manager
become active under this
setting (that are grayed
out when you are offline).
SV61314 Rev. A

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fastpac di950

Table of Contents