User's Manual
44
High Availability Maintenance
This section describes various maintenance procedures when the device operates in the
High Availability mode.
44.1
Initiating an HA Switchover
You can initiate a switchover from the Active to Redundant device.
Note:
unavailable.
To perform a switch-over:
1.
Open the High Availability Maintenance page:
•
Toolbar: Click the Actions button, and then from the drop-down menu, choose
Switchover.
•
Navigation tree: Setup menu > Administration tab > Maintenance folder > High
Availability Maintenance.
2.
Click Switch Over; a confirmation box appears requesting you to confirm.
3.
Click OK.
44.2
Resetting the Redundant Unit
You can reset the Redundant device, if necessary.
Note:
unavailable.
To reset the Redundant device:
1.
Open the High Availability Maintenance page:
•
Toolbar: Click the Actions button, and then from the drop-down menu, choose
Switchover.
Version 7.2
When performing an HA switchover, the HA mode becomes temporarily
Figure 44-1: Performing a Device HA Switchover
When resetting the Redundant device, the HA mode becomes temporarily
44. High Availability Maintenance
767
Mediant 800B Gateway & E-SBC