Metal brackets from the CHS2U JOINT BRACKET KITs will be
required to secure the top end of the chassis with screws. See
3-21 Install Additional CHS2U STAND KIT (EXT) on page
Figure 3-21 Install Additional CHS2U STAND KIT (EXT)
4. Using supplied screws, secure the CHS2U STAND KIT to the floor
(refer to
Figure 3-21 Install Additional CHS2U STAND KIT (EXT) on
page
3-18).
To prevent possible damage to the 19" chassis due
to falling, NEC recommends screws be installed in
the stand mount brackets as soon as possible.
5. Connect the ground wire to all chassis. Refer to
Chassis Grounding on page 3-33
the system.
6.
Refer to
2.5 Installing the 19" Chassis on page 3-21
installation of the chassis or, Chapter 4 paragraph
Extension or Trunk Blade on page 4-4
http//vietpro.com.vn
UNIVERGE SV8100
2.5.5 Install 19"
for complete details on grounding
2.2 Installing an
for installation of blades.
Installing the SV8100 Chassis
Figure
3-18.
to continue

Advertisement

Table of Contents
loading

Table of Contents