Installation
To install the PZ-2BRIA on the CD-2BRIA:
Attach the PZ-2BRIA daughter board to the CD-2BRIA blade by lining up
the CN5 connectors and pressing the boards together. (Refer to
4-23 Installing the PZ-2BRIA Daughter Board on page
1. Install the CD-2BRIA blade into the system chassis.
2. Before proceeding to Step 3, wait to verify that the STATUS LED starts
to flash.
With normal operation, the status LED flashes fast. If
trouble was found during the self diagnostics routine,
the status LED flashes slow.
Once connected, the PKG LED will not be indicated for
the status of Layer 1 Link.
3. Connect the cable from the NT1 Network Termination cable to the CN7
or CN8 connector on the CD-2BRIA and/or PZ-2BRIA daughter board.
http//vietpro.com.vn