NEC Univerge SV8100 System Hardware Manual page 125

Hide thumbs Also See for Univerge SV8100:
Table of Contents

Advertisement

2.6
Powering Up the SV8100
2.6.1
4-8
CHUYÊN CUNG CẤP TỔNG ĐÀI NEC
Performing a Cold Start
This section describes the process for starting the system for the first time
or starting a system that has been turned off.
System software loaded from flash memory, and the customer
data is erased from RAM memory.
To avoid extension and trunk renumbering, if certain blades are
recognized first, remove them from their respective slots until
the system has been reset. Then, slot the blade cards in the
correct order to retain the proper system numbering (Use
Program 10-03 prior to performing a cold start to record the
current slot definitions.).
To perform a cold start:
1. Turn the system power off.
2. Once the system has powered down, push in and hold the Load button.
3. Turn the power switch back on to power the system back up.
With a multi-chassis system, turn on the Expansion Chassis
power supply, then the Controlling Chassis power supply.
4. Continue holding the Load button for approximately three seconds or
until LED 2 starts flashing red.
5. Release the Load button.
6. When the system has completed reloading the software (two minutes),
the Status LED is flashing on the CD-CP00.
IMPORTANT CONSIDERATIONS
Installing the SV8100 Blades