NEC Univerge SV8100 System Hardware Manual page 135

Hide thumbs Also See for Univerge SV8100:
Table of Contents

Advertisement

4-18
CHUYÊN CUNG CẤP TỔNG ĐÀI NEC
1. Install the battery on the CD-CP00. The polarity "+" symbol must be on
top as illustrated in
Battery Socket
Figure 4-5 CD-CP00 Battery Installation
2. Refer to
Figure 4-4 CD-CP00 Blade with Daughter Boards Installed on
page
4-15
to
PZ-32IPLA/PZ-64IPLA/PZ-128IPLA daughter board, if required.
3. Ensure the power supply is OFF, and then slide the CD-CP00 into the
Slot-1 of the Controlling Chassis.
4. If external Background Music (BGM) or Music on Hold (MOH) is being
installed, plug the cable into the CN8 or CN9 pin jack connector on the
CD-CP00. The other end of the cable plugs into the music source.
♦ Refer to the IP1WW-2PGDAD in the
Optional Equipment
6-1
for details on connecting to a music source.
♦ When the system software is upgraded, the flash memory is
updated with the new software version. Either the Hot or Cold
start-up method can be used or the system can be upgraded using
system software. Refer to
2.6.2 Performing a Hot Start on page
Software Upgrade on page
♦ Customer information is stored in the RAM memory which is
restored after a power failure, will be restored. The lithium battery in
the system saves the RAM memory when power is lost.
Figure 4-5 CD-CP00 Battery
install
the
PZ-VM21,
section
2.1 Using a IP1WW-2PGDAD on page
2.6.1 Performing a Cold Start on page
4-12.
Installing the SV8100 Blades
http//vietpro.com.vn
UNIVERGE SV8100
Installation.
Battery
PZ-ME50
Chapter 6 Installing SV8100
4-9, or
2.6.4 Performing a
and/or
4-8,

Advertisement

Table of Contents
loading

Table of Contents