2. Commissioning
2.5

Check list for commissioning the CPX terminal with FB32

Festo P.BE−CPX−FB32−EN en 0605NH
Please observe the general commissioning instructions in
·
the CPX system manual.
Check the DIL switch settings and the network configur
·
ation before using and replacing CPX terminals.
Check the configured address range. If necessary, test the
·
I/Os.
Check the address assignment of the I/Os on the CPX
·
terminal. For this purpose you can, if necessary, force the
I/Os (see CPX system manual).
Make sure that the desired parametrizing of the CPX ter
·
minal in the start−up phase or after field bus interruptions
is restored by the plug−in module. This is to ensure that if
the CPX terminal is replaced, the new terminal will also be
operated with the desired parameter settings.
Use spot checks if necessary to check the parametrizing,
·
e.g. with the configuration program or with the Handheld.
2−33