Ricoh A230 Service Manual page 192

Hide thumbs Also See for A230:
Table of Contents

Advertisement

Rev. 01/99
[G]
[D]
[F]
8. If the customer requires the punch unit, install it now, before attaching the
finisher to the machine. See Punch Unit Installation.
9. Open the front door of the finisher [A], and remove the screw [B] which secures
the locking lever [C]. Then pull the locking lever.
10. Align the finisher on the joint brackets, and lock it in place by pushing the
locking lever.
11. Secure the locking lever (1 screw [B]) and close the front door.
12. Attach the exit guide mylar [J ] to the anti-static brush bracket located above the
upper tray exit roller as shown.
13. Install the shift tray guide [D] on the shift tray. If the customer does not wish to
install it on the shift tray, store it at location [E].
NOTE: The shift tray guide is required to assist in proper paper stacking.
However, it reduces the capacity of the shift tray by 50, from 3000 to
2950.
14. Install the shift tray [F] (4 screws).
15. Connect the finisher cable [G] to the main machine.
16. Attach the staple position decal [H] to the ARDF or platen cover as shown.
17. Turn on the main power switch and check the finisher operation.
SM
3,000-SHEET FINISHER INSTALLATION
[J ]
[A]
A230I756.WMF
3-51
[H]
[C]
[B]
[E]
A230/A231/A232

Advertisement

Table of Contents
loading

This manual is also suitable for:

A231A232

Table of Contents