Minimum Air Clearance (Frame F)

There is no through panel-mount capability for the 650G Frame F.
Note:
Cubicle-Mount Product/Application (Frame F)
(Europe: IP2x, USA/Canada: Open Type).
The drive must be mounted in a suitable cubicle.
Figure 11 Air Clearance for a Cubicle-Mount Product/Application
Duct Kit
A Duct kit, Part Number LA466717U003 is available for the 650G Frame F drive.
The installation diagram is provided on the following page.
 The duct length determines the vertical position of the drive in the cubicle. Drill the lower
 Cut-out the hole for the duct directly above where the drive sits. Project the position of the
 Because of the weight of the drive, it may be better to secure the drive in the cubicle first,
 Fix the duct to the drive using the M4 fasteners.
 Fit the gasket between the duct cowling and the top of the cubicle to provide a good seal.
650G AC Drive
J
L
M
Model Recognition
Clearances for Standard Product (mm)
J
Frame F
0 (zero)
Protect any equipment in the cubicle from swarf etc.
mounting panel hole centres for the drive at 976mm from the top of the cubicle. There is a
generous tolerance of 4mm.
drive mounting surface inside the cubicle and mark it on the roof. From the drawing, you
can calculate that the cut-out is made 8.5mm in front of the drive mounting surface (the
centres for the cowling fixing holes will be 7.5mm behind the drive mounting surface).
Draw the cut-out shape, check its position, and cut it out.
and lower the duct into the cubicle from above.
Drill through and secure all this with the M6 fasteners.
www.comoso.com
Installing the Drive
K
Heat
Control
Sink
K
25
Caution
Ensure all equipment is isolated.
3-10
L
M
70
70

Advertisement

Table of Contents
loading

Table of Contents