Chapter 7: Post-installation Verification

Post-installation Verification

After initial configuration, it is necessary to test the installation, and remove the installation
equipment.

Roadmap for post installation

Perform these post-installation procedures in the following order using the appropriate procedure
described in this section:
1. Test the installation
2. Remove the installation equipment

Installation testing

When the installation is complete, you must perform simple tests to verify telephone and data
connectivity.

Testing data connectivity

About this task
Test data connectivity by pinging the IP address of each device to test the device's connectivity
within the network and outside the network.

Testing telephones

Procedure
1. Make outgoing calls from the telephone.
Make sure you hear a dial tone when you pick up the receiver. Make sure you can make
both an internal (within the local network) and an external (outside the local network) call.
October 2019
Deploying and Upgrading Avaya G450 Branch Gateway
Comments on this document? infodev@avaya.com
58

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents