Chapter 6: After Installation; Step 1: Test The Installation; Testing Data Connectivity; Testing Telephones - Avaya G350 Installing And Upgrading

Hide thumbs Also See for G350:
Table of Contents

Advertisement

Chapter 6: After installation

After initial configuration, it is necessary to test the installation, and remove the installation
equipment.

Step 1: Test the installation

When the installation is complete, simple tests must be performed to test telephone and data
connectivity.

Testing data connectivity

Test data connectivity by pinging the IP address of each device to test the device's connectivity
within the network and outside the network.
Test local data connectivity on-site by checking that you can send an email between two PCs
that are connected to the G350.

Testing telephones

1. Make outgoing calls from the telephone. Make sure you hear a dial tone when you pick up
the receiver. Make sure you can make both an internal (within the local network) and an
external (outside the local network) call.
2. Make a call to the telephone from both within the network and outside of the network.

Testing trunks

Use the facility test call feature to verify that each trunk is functioning properly.
For information about how to use the facility test call feature, see Maintenance Procedures for
Communication Manager 4.0, Media Gateways and Servers, 03-300432.
Issue 4 February 2007
81

Advertisement

Table of Contents
loading

Table of Contents