Chapter 4: Installation
11. Connect an inlet tubing section (provided in Kit) from the bulkhead to the fitting on the top of the sipper
tube.
12. Repeat steps
5
13. If you are also installing the fail safe option, cut and remove the tie wrap used to secure the sensor to
the Analyzer during shipping.
14. Remove the U-bolt from the sensor and position the U-bolt over and near the end of the pipe with the
sipper tube.
15. Insert the ends of the U-bolt through the holes on the sensor, and then attach and secure a washer and
nut finger-tight. (Do NOT use an additional tool to tighten, as this may break the sensor.)
16. If you have the fail-safe option, repeat the steps
17. Connect the pipe nearest the instrument (the pipe without the internal sipper tube) to the sample
source. (See
Figure 27: Overflow Method — Installation on page
18. Connect the pipe farthest from the instrument (the pipe without the internal sipper tube) to the waste
outlet.
Figure 27: Overflow Method — Installation on page 97.

Installing the Check Standard System

The Analyzer can automatically measure a check standard periodically when it is operating in the Online mode.
Check standard measurements also can be manually initiated when desired.
Access one of the 1/8-in. OD tubes in the Analyzer's accessories. Attach the 1/4-28 PEEK fitting in the Check
Standard port on the left side of the Analyzer. The fitting should be finger-tight.
GE Analytical Instruments ©2016
through
11
for each stream.
Figure 29: Overflow Method — Failsafe Installation
13
through
15
for each stream.
97.)