GE Sievers Innovox Operation And Maintenance Manual page 78

Toc analyzer
Hide thumbs Also See for Sievers Innovox:
Table of Contents

Advertisement

Chapter 4: Installation
3.
The waste tube fitting requires a vent tube to be attached to ensure that corrosive and noxious gases
are routed away from the instrument. The vent tube should be connected to the upper straight barb
fitting and routed at least 2 meters away.
N
:
If the Online unit is installed in a closed cabinet or small enclosed room, it is required to vent the
OTE
waste line as described in step 3.
N
:
The waste container can be located on or below the surface on which the Analyzer is at or below the
OTE
bottom of the Analyzer. Do not place the waste container higher than that surface because the gas-
liquid separator will not drain properly. Also, try to minimize the length of tubing used and ensure a
straight tubing path (avoid bending the tubing).
To protect against inhalation of toxic fumes, make sure the Analyzer is installed in a
well-ventilated area. Depending on the composition of the sample, halogens such
as chlorine or bromine, or toxic fumes from fluoride, cyanide, or other toxic salts,
can be emitted into the Analyzer's waste. To protect against inhalation of
hazardous fumes, add sodium hydroxide (lye) or sodium carbonate (soda ash) to the
waste container to neutralize acid in the waste. Avoid stratification of the waste
within the container by occasionally agitating the container.
GE Analytical Instruments ©2016
Warning
78 of 270
DLM 68100-09 EN Rev. A

Advertisement

Table of Contents
loading

Table of Contents