Figure 25 Overflow Method - External Sample Pump Position; Figure 26 Overflow Method - Barb Fittings Identification - GE Sievers Innovox Operation And Maintenance Manual

Toc analyzer
Hide thumbs Also See for Sievers Innovox:
Table of Contents

Advertisement

Chapter 4: Installation
3.
Connect the sample to the peristaltic pump. Refer, as needed, to
on page
89.
4.
Locate a Wastewater Sampler pipe assembly and a small-size barbed fitting for each of the streams
you are installing.
Small-size Barb Fitting
5.
For Overflow method, install a small-size barb into the open end of the sample inlet pipe. This is the pipe
with the internal sipper tube (needle).
N
:
Leave the pre-installed barb inside the other pipe (the pipe without the internal sipper tube).
OTE
6.
Locate the filter vents located in the Wastewater Sampler Kit.
GE Analytical Instruments ©2016
Figure 25: Overflow Method — External Sample Pump Position
Figure 26: Overflow Method — Barb Fittings Identification
"Installing the Online Sample System"
Large-size Barb Fitting
96 of 270
DLM 68100-09 EN Rev. A

Advertisement

Table of Contents
loading

Table of Contents