Specifications - Ip56 Accessory; Step 11: Turn On Power And Configure Basic Settings; Setting The Clock; Step 12: Perform A Test Analysis - GE Sievers Innovox Operation And Maintenance Manual

Toc analyzer
Hide thumbs Also See for Sievers Innovox:
Table of Contents

Advertisement

Chapter 4: Installation
IP56 Accessory
Specifications —
Typical supply:
Pressure
Demand (Flow)
Maximum Pressure

Step 11: Turn on Power and Configure Basic Settings

Enable power to the Analyzer. Before using the Analyzer, you may need to configure various basic settings.
1.
Turn on the power switch located on the side of the Analyzer. The display will light up. (It can take up to
two minutes for the System Info screen to appear.) If this does not occur, refer to
"Troubleshooting."
2.
The System Info screen appears with a reminder to attach the waste lines. If the waste lines were not
attached already, do that now (see Installation Step 4). When ready, press the Main button on the
display.

Setting the Clock

Set the Analyzer clock to ensure that all TOC measurements reflect the correct date and time, as follows.
1.
Press the Menu button.
2.
Select the Maintenance tab.
3.
Press the Advanced button
4.
Press the Clock button.
5.
Specify the correct date and time via each of the buttons.
6.
Press the Save button, and then press the Back button twice.

Step 12: Perform a Test Analysis

To confirm that the Analyzer is in proper working condition, perform a test analysis on a sample for which you
know the approximate TOC or NPOC value and which has a concentration of less than 1,000 ppm.
1.
Insert the check standard tube into the sample.
2.
Press the Setup tab, and then press the Check Standard button. Press the Check Standard Setup
button.
GE Analytical Instruments ©2016
60 psi (4.9 Bar)
0.36 scfm (10 L/min)
100 psi (7 Bar)
102 of 270
Chapter 9,
DLM 68100-09 EN Rev. A

Advertisement

Table of Contents
loading

Table of Contents