8. Install the front ball joint link assembly between the
frame and the engine bracket (Fig. 262). Follow the
hardware sequence in the diagram (Fig. 263).
Fig 262
B
A
D
C
A
Fig 263
A. Washer
B. Screw HH
C. Ball joint assembly
D. Nut - jam
Z Master Z597 Diesel Service Manual
DSC-2484
E
F
G
F
H
front
E. Link - ball joint
F. Washer, large
G. Isolator
H. Nut - lock
9. Install the rear ball joint assembly between the
flywheel cover and the frame (Fig. 264). Follow the
hardware sequence in the diagram (Fig. 265).
Fig 264
B
A
D
C
A
Fig 265
A. Washer
B. Screw HH
C. Ball joint assembly
D. Nut - jam
ENGINE
DSC-2457
E
F
G
F
H
rear
E. Link - ball joint
F. Washer, large
G. Isolator
H. Nut - lock
5-13
5