Installing The Optional Metal Rough-In Box - AMX MVP-9000i-GB Instruction Manual

Table of Contents

Advertisement

7.
Attach the included snap-on ferrite to the Ethernet cable, as close to the RJ-45 connector as possible. Attach the cable to the
Ethernet Port (FIG. 15).
Ferrite installation position
Recommended Ethernet cable path
MVP-WDS-9 - Ethernet cable path
FIG. 15
8.
Firmly seat the device against the back box. Make sure that the tab connector at the bottom of the device is locked into the
back box.
9.
Insert the two installation screws from the MVP-WDS-9 Installation Kit into the screw holes in the interior compartment of the
device and tighten them to anchor the device to the back box.
NOTE: For ease of installation, put each screw on a neodymium magnet in the device's interior compartment to keep them on
hand until they are needed.
10. After fully seating the screws, wipe down the area around the screw holes with the alcohol prep pad from the Installation Kit.
Take a rubber foot and remove its adhesive backing. Put the foot, adhesive-side down, in the slot surrounding the screw hole
in the Wall Docking Station. Press down firmly to remove any air bubbles from underneath the foot.
11. Install an MVP-9000i device by placing it into the interior compartment bottom-first. Press the top of the touch panel until it
is flush with the Wall Docking Station. The neodymium magnets will hold it in place.
12. To remove the MVP-9000i, unlock the touch panel (see the Unlocking the Touch Panel section on page 24 for more
information) and wait for the touch panel to pull away from the Wall Docking Station. Once it has been released, grip it by the
top of the device, and pull it free from the Docking Station.

Installing the Optional Metal Rough-In Box

The optional metal rough-in box (FG038-13) is 11.97 inches (30.40cm) wide at its widest dimension (wider than the bezel of the
Wall Docking Station), and is only intended for pre-construction installations (FIG. 16). The Metal Rough-In Box is used in
conjunction with the Wall Docking Station's plastic back box.
NOTE: In order to ensure a stable installation of the MVP-WDS-9, the distance between the CB-MVP-WDS9 and the outer wall surface
must be a minimum of .50 inches (1.27cm) and a maximum of .1.50 inches (3.81cm).
Front Cover
Mounting Screws
CB-MVP-WDS9 Rough-In Box - with front cover
FIG. 16
MVP-9000i - Instruction Manual
Recommended Ethernet installation
Ethernet port
Screws for
Dry Wall Clips
A
Recommended USB installation
Knockout placement
in back box
Dry Wall Clips
B
Accessories
27

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mvp-9000i-gw

Table of Contents