Navigation Structure - Busch-Jaeger Busch-ComfortTouch Product Manual

Table of Contents

Advertisement

After clicking on the "Application settings" button in the "Parameter" window, you can
make settings in a separate window for the use of different applications. Please con-
sider, that some settings are only available, when the according application is projected
or placed on the screen.
Note: You can find more detailed information about the different setting options in the
online help of the IP Project program.
8.4

Navigation structure

You can insert elements in the navigation bar from the "Elements" library window on
the left. To do this, drag (using the left mouse button) the corresponding element to the
grey bar in the working area and let it drop (drag & drop). Using this method, so-called
containers (these can contain additional screen pages), screen pages or applications
(from the "Applications" area in the "Elements" window) can be placed on the naviga-
tion bar.
In order to fill an empty container with additional sub-pages, you must click on the small
arrow on the left side of the corresponding grey bar in the navigation bar. You can then
insert up to six additional pages.
If you want to change the order of the entries in the navigation bar, simply use the drag
& drop method to do this. In this way, you can create the navigation structure in the
navigation bar that the end user will then see.
50/240

Advertisement

Table of Contents
loading

Table of Contents