Exabyte 230D Library Installation And Operation Manual page 278

Table of Contents

Advertisement

Appendix E
264
Position the foam packing cushions inside the sleeve at each
of the library's four corners. Make sure you line up the blue
foam pieces with the sides of the library and the white foam
pieces with the front and back of the library, as shown in the
figure.
Lay the necessary paperwork on top of the library.
Exabyte 230D

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 230D Library and is the answer not in the manual?

Questions and answers

Table of Contents