Single Parallel-Ready Ups Installation - Eaton Powerware BladeUPS User Manual

12 kva
Hide thumbs Also See for Powerware BladeUPS:
Table of Contents

Advertisement

STANDARD SYSTEM INSTALLATION
78
Eaton BladeUPS (12 kVA) User's Guide
Figure 63. Connecting UPSs to the BladeUPS Bar (Bottom Entry Shown)

Single Parallel-Ready UPS Installation

Only qualified service personnel (such as a licensed electrician) shall perform the electrical installation. Risk
of electrical shock.
NOTE Do not make unauthorized changes to the UPSs; otherwise, damage may occur to your equipment
and void your warranty.
To install one UPS in a parallel-ready configuration:
1.
Verify that the UPS is installed in a rail kit in a rack containing a BladeUPS Bar.
2.
Switch off utility power to the distribution point where the parallel-ready UPS
system will be connected. Be absolutely sure there is no power.
S
164201649 Rev 6 www.eaton.com/powerqualtiy
Plug Retainer
1
2
3
W A R N I N G

Advertisement

Table of Contents
loading

Table of Contents