EBM Setup

The BladeUPS EBM comes with all hardware required for installation in a
standard EIA or JIS seismic rack−mount configuration with square and
round mounting holes. The rail assemblies adjust to mount in 48−cm
(19−inch) racks with front to rear rail distances from 61 to 76 cm (24 to
30 inches) deep.

Checking the EBM Accessories

Verify that the following items are included with the EBM:
S
S
S
S
NOTE Discard the EBM user's guide if you are installing the EBM with a new UPS at the
same time. Use the UPS user's guide instead to install both the UPS and the EBM.
28
EATON Powerware
Replace the wireway top cover (does not apply to top entry wiring
in a bottom entry rack) and the wireway access cover.
EBM Setup." Otherwise, continue to UPS Setup" on page 34.
EBM front cover
Mounting brackets and fasteners (if not already installed):
− (2) mounting brackets
− (4) 6−32 flat−head screws
Rails and fasteners:
− (2) sliding rail assemblies (left and right)
− (2) rear hold−down brackets
− (12) hex−head screws
− (4) U−shaped 10−32 clip nuts
EBM user's guide
®
BladeUPSt (12 kVA) User's Guide
S
164201649 Rev 3 www.powerware.com

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powerware bladeups

Table of Contents