Lexmark X940e Service Manual page 303

Mfp finisher
Hide thumbs Also See for X940e:
Table of Contents

Advertisement

14. Loosen the two screws securing the belt tensioner bracket (D) to the finisher and move it upward, as shown.
Replacement note: When replacing the belt tensioner bracket (D), tighten the screws in the order shown.
15. Remove the belt (paddle/entrance) (E) from the main paddle drive pulley/gear 44/20T (F).
16. Release the hook from the main paddle shaft drive pulley 17T (G) inside the finisher.
17. Remove the main paddle shaft drive pulley 17T (G).
Note: The belt (H) will become attached.
E
D
Second
First
18. Remove the 6 mm bushing (I).
19. Release the hook of the main paddle drive pulley/gear 44/20T (F) from the shaft (J).
20. Remove the main paddle drive pulley/gear 44/20T (F).
21. Remove the 6 mm bushing (K).
22. Remove the main paddle idler gear 23T right (L).
23. Remove the two front and the two rear screws securing the main paddle shaft assembly (M).
24. Move the main paddle shaft assembly (M) forward and then downward and outward.
D
G
I
H
Repair information
7510-XXX
M
4-85

Advertisement

Table of Contents
loading

This manual is also suitable for:

X945e

Table of Contents