TRAY HEATER (OPTIONAL LCT)
[A]
[C]
[A]
[B]
[D]
[E]
7. Install five clamps [A].
8. Connect the cable [B] to the tray heater cable [C].
9. Route the cable and clamp it.
10. Remove the connector cover of the copier [D].
11. Join the connectors [E].
12. Reinstall the connector cover of the copier.
B205/B209/D007/D008
1-64
SM