Basic - NETGEAR GSM7252PS - ProSafe 52 Ports Gigabit Ethernet L2 Managed Stackable Switch User Manual

Prosafe gigabit l3 managed switch web management user manual
Hide thumbs Also See for GSM7252PS - ProSafe 52 Ports Gigabit Ethernet L2 Managed Stackable Switch:
Table of Contents

Advertisement

ProSafe® Gigabit L3 Managed Stackable Switches Software Administration Manual

Basic

From the Basic link, you can access the following pages:
Stack Configuration
on page 80
Stack Configuration
This page moves the Primary Management Unit functionality from one unit to another. Upon
execution, the entire stack (including all interfaces in the stack) is unconfiugred and
reconfigured with the configuration on the new Primary Management Unit. After the reload is
complete, all stack management capability must be performed on the new Primary
Management Unit. To preserve the current configuration across a stack move, save the
current configuration to the NVRAM before performing the stack move. A stack move causes
all routes and layer 2 addresses to be lost. The administrator is prompted to confirm the
management move.
80 |
Chapter 2. Configuring System Information

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gsm7228psProsafe gsm7352s

Table of Contents