Packing The Acx Series Router For Shipment - Juniper ACX4000 Hardware Manual

Universal metro router
Hide thumbs Also See for ACX4000:
Table of Contents

Advertisement

• Place individual components in antistatic bags.
• Write the RMA number on the exterior of the box to ensure proper tracking.
CAUTION: Do not stack any of the hardware components.

Packing the ACX Series Router for Shipment

To pack the router for shipment:
1.
Retrieve the shipping box and packing materials in which the router was originally shipped. If you
do not have these materials, contact your Juniper Networks representative about approved
packaging materials.
2.
On the console or other management device connected to the Routing Engine, enter CLI
operational mode and issue the following command to shut down the router software.
user@host> request system halt
Wait until a message appears on the console confirming that the operating system has halted.
For more information about the command, see the
3.
Attach an ESD grounding strap to your bare wrist, and connect the other end of the strap to an ESD
grounding point.
4.
Shut down power to the router by pressing the AC input switch or DC circuit breaker for all power
supplies to the off (O) position.
5.
Disconnect power from the router.
6.
Remove the cables that connect to all external devices.
7.
Remove all field replaceable units (FRUs) from the router.
8.
Remove the router from the rack. One person should grasp the router while a second person
unscrews and removes the mounting screws from the rack. One lifter can then move the router to
the shipping container.
9.
Place the router in the shipping container.
10. Cover the router with an ESD bag and place the packing foam on top of and around the router.
11. Replace the accessory box on top of the packing foam.
12. Securely tape the box closed.
13. Write the RMA number on the exterior of the box to ensure proper tracking.
CLI
Explorer.
160

Advertisement

Table of Contents
loading

Table of Contents